Close Menu
The Westside GazetteThe Westside Gazette
    Facebook X (Twitter) Instagram
    • About Us
    • Contact
    • Media Kit
    • Political Rate Sheet
    • Links
      • NNPA Links
      • Archives
    • SUBMIT YOUR VIDEO
    Facebook X (Twitter) Instagram
    The Westside GazetteThe Westside Gazette
    Advertise With Us
    • Home
    • News
      • National
      • Local
      • International
      • Business
      • Releases
    • Entertainment
      • Photo Gallery
      • Arts
    • Politics
    • OP-ED
      • Opinions
      • Editorials
      • Black History
    • Lifestyle
      • Health
      • HIV/AIDS Supplements
      • Advice
      • Religion
      • Obituaries
    • Sports
      • Local
      • National Sports
    • Podcast and Livestreams
      • Just A Lil Bit
      • Two Minute Warning Series
    The Westside GazetteThe Westside Gazette
    You are at:Home » Ethiopia Completes Second Phase Of Filling Africa’s Largest Dam, Angering Egypt And Sudan 
    News

    Ethiopia Completes Second Phase Of Filling Africa’s Largest Dam, Angering Egypt And Sudan 

    July 26, 20213 Mins Read3 Views
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email
    Advertisement

    NICOSIA, Cyprus — The announcement by Ethiopia that it completed the second phase of filling the giant Grand Renaissance Dam (GERD), Africa’s largest dam, angered Egypt and Sudan.

    Egypt, which used diplomatic means to prevent the quick filling of the dam and has even threatened to use military force against Ethiopia, saw its efforts fall flat and ignored by Addis Ababa.

    Egypt and Sudan have been locked in a decades-long dispute with Ethiopia over the dam due to Addis Ababa’s insistence to fill the dam’s reservoir without reaching a binding agreement with its downstream neighbors.

    “Today, July 19, 2021, the GERD reservoir reached overtopping water level,” tweeted Seleshi Bekele, Ethiopia’s Minister of Water, Irrigation, and Energy.

    “Currently, the incoming flow passes through both bottom outlets and overtopping. This year also we are experiencing extreme rainfall in the Abbay Basin (Blue Nile Basin). As a result, the GERD reservoir has filled rapidly. GERD is an Ethiopian hydropower dam and guardian infrastructure asset for the downstream countries against climate change. It is also a means to develop further and prosper together, and it can never be a threat.”

    Now the $5-billion project can start producing desperately needed electricity, as currently 60 percent of Ethiopia’s population are not connected to the grid.

    The question of the dam’s impact over the Blue Nile river has incited a strong nationalist fervor in Egypt, which gets 90 percent of all its water comes from the Nile.

    A severe reduction in the volume of water flowing from Ethiopia would have dire consequences on Egypt’s 100 million population, which grows by 2 million a year.

    Egyptian economists estimate that, due to the dam, the North Africa country could lose 10 billion cubic meters of water a year out of the 50 million cubic meters it received up to 2019.

    “If the growing water deficit is not addressed properly, Egypt could lose up to 72 percent of its agricultural area, the unemployment rate could increase from 14 percent to 25 percent, and agricultural production could lose up to $51 billion in three years, and then the average income of the average citizen will decrease by 8 percent,” said Egypt space scientist Essam Hajji.

    He was involved in developing a model to calculate the current and future water deficit in groundwater for all North African countries and the Arabian Peninsula due to climate change.

    Egyptian President Abdel al-Fattah al-Sissi warned on July 15, 2021, that any reduction of Egypt’s water supply is a red line that “cannot be crossed,” adding that “Before anything happens to Egypt, the army and I would have to be gone.”

    When the Ethiopian government informed Cairo at the beginning of July 2020 that it would start the second phase of filling the dam, the Egyptian Ministry of Irrigation complained to the United Nations Security Council about Addis Ababa’s move.

    On its part, Sudan’s Irrigation Ministry, in a statement, rejected “unilateral measures from neighboring Ethiopia and policies of imposing a fait accompli and ignoring the legitimate interests and serious concerns of its river partners.”

    Sudan claims that it has lost 50 percent of its share of the water due to the filling of the reservoir.

    Egypt and Sudan held joint military exercises called “Guardians of the Nile,” but this failed to make the Ethiopian government change its mind over the filling of the dam.

    (With inputs from ANI)

    (Edited by Amrita Das and Kipchumba Some)



    The post Ethiopia Completes Second Phase Of Filling Africa’s Largest Dam, Angering Egypt And Sudan  appeared first on Zenger News.

    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email
    info@zenger.news'
    zenger.news
    • Website

    Related Posts

    We Must Work Together to Solve Our Waste Crisis in Broward County

    July 2, 2026

    Fort Lauderdale Rolls Out New Group Violence Intervention Plan to Cut Gun Violence

    June 26, 2026

    The Blueprint of Manipulation: How Jeffrey Epstein’s Power Network Conditioned it’s Victims

    November 17, 2025

    (Please enter your Payment methods data on the settings pages.)
    Advertisement

    View Our E-Editon

    Advertisement

    –>

    Advertisement
    Advertisement
    advertisement

    Advertisement

    –>

    The Westside Gazette
    Facebook X (Twitter) Instagram Pinterest
    © 2026 The Westside Gazette - Site Designed by No Regret Media.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version