Close Menu
The Westside GazetteThe Westside Gazette
    Facebook X (Twitter) Instagram
    • About Us
    • Contact
    • Media Kit
    • Political Rate Sheet
    • Links
      • NNPA Links
      • Archives
    • SUBMIT YOUR VIDEO
    Facebook X (Twitter) Instagram
    The Westside GazetteThe Westside Gazette
    Advertise With Us
    • Home
    • News
      • National
      • Local
      • International
      • Business
      • Releases
    • Entertainment
      • Photo Gallery
      • Arts
    • Politics
    • OP-ED
      • Opinions
      • Editorials
      • Black History
    • Lifestyle
      • Health
      • HIV/AIDS Supplements
      • Advice
      • Religion
      • Obituaries
    • Sports
      • Local
      • National Sports
    • Podcast and Livestreams
      • Just A Lil Bit
      • Two Minute Warning Series
    The Westside GazetteThe Westside Gazette
    You are at:Home » New Zealand City Auckland Gets New Cycleway Bridge
    News

    New Zealand City Auckland Gets New Cycleway Bridge

    June 4, 20213 Mins Read3 Views
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email
    Advertisement

    AUCKLAND, New Zealand — The New Zealand government has rerouted billions of dollars worth of transport spending while committing to building a new bridge in Auckland devoted to walkers and cyclers.

    The $NZ685 million ($489 million) bridge, known as the Northern Pathway, will be a standalone bridge running alongside the Auckland Harbor Bridge, crossing Waitemata Harbour.

    New Zealand Transport Minister Michael Wood said the bridge would be “an outstanding piece of tourism infrastructure”.

    “Northern Pathway is the missing link in Auckland’s walking and cycling network and Aucklanders finally will be able to get across the harbor by foot or bike,” he said.

    Map of Auckland's Waitemata Harbour, New Zealand.

    Michael Philip Wood is a New Zealand politician and, since winning the Mount Roskill by-election in December 2016, a member of the New Zealand House of Representatives. He is a member of the Labour Party.

    Last weekend, around 1000 cyclists defied a police barricade to cycle across the existing eight-lane harbor bridge to protest the lack of cycling infrastructure in New Zealand’s biggest city.

    The government hopes to commence construction on the new bridge by 2022, finishing by 2027.

    Jacinda Ardern’s government has also scrapped previously pledged infrastructure, citing cost blowouts.

    New Zealand Transport Minister Michael Wood said the bridge would be “an outstanding piece of tourism infrastructure”. (Ben McKay/AAP Image)

    In January 2020, it unveiled the $NZ12 billion ($8.58 billion) “NZ Upgrade Program”, which it said was the largest infrastructure spending package in decades. As well as construction starts under the “NZ Upgrade Program”, project development work has been carried out to get a better understanding of projects that were still in their early stages of development. We’ve also engaged with communities to get their input to further develop designs and preferred routes, as well as getting projects ready for construction.

    The program will play a vital role in helping to stimulate the economy and support the country as it recovers from the impacts of Covid-19.

    The program is already supporting jobs and the economy, with about 800 people developing projects and getting them ready for construction. In addition, the Papakura to Drury South construction will see about 750 people working on the project, with about 100 on-site at any one time.

    It’s now rolling some of that $NZ6.8 billion ($4.86 billion) of transport spending back, committing only to 26 of the announced 32 projects.

    Around 1000 cyclists defied a police barricade to cycle across the existing eight-lane harbour bridge to protest the lack of cycling infrastructure in New Zealand’s biggest city. (Christopher Samuel/AAP Image)

    “Fully funding the new estimated costs for every project would have cost up to $NZ6 billion ($4.29 billion) extra on top of the original $NZ6.8 billion ($4.86 billion),” Finance Minister Grant Robertson said. Grant Murray Robertson (born 30 October 1971) is a New Zealand politician and member of the Labor Party who has served as Deputy Prime Minister of New Zealand since 2020 and Minister of Finance since 2017. He has served as Member of Parliament (MP) for Wellington Central since 2008.

    Among the dropped projects is the biggest, a 21.5km road through south Auckland which more than doubled from the previously cited $NZ1.4 billion ($1 billion).

    (Edited by Vaibhav Vishwanath Pawar and Ritaban Misra. Map by Urvashi Makwana)



    The post New Zealand City Auckland Gets New Cycleway Bridge appeared first on Zenger News.

    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email
    info@zenger.news'
    zenger.news
    • Website

    Related Posts

    Emeril Lagasse Foundation Expands National Culinary Education Program to Larkdale Elementary School in Lauderhill, Florida

    August 24, 2026

    We Must Work Together to Solve Our Waste Crisis in Broward County

    July 2, 2026

    Fort Lauderdale Rolls Out New Group Violence Intervention Plan to Cut Gun Violence

    June 26, 2026

    (Please enter your Payment methods data on the settings pages.)
    Advertisement

    View Our E-Editon

    Advertisement

    –>

    Advertisement
    Advertisement
    advertisement

    Advertisement

    –>

    The Westside Gazette
    Facebook X (Twitter) Instagram Pinterest
    © 2026 The Westside Gazette - Site Designed by No Regret Media.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version